Irrigation Scheduling

Build a weekly sector schedule from water demand and the real irrigation window.
USER INPUT

Calculation inputs

Saved locally

Empty fields are never replaced with invented agronomic values. Results update only from visible data.

Irrigation days
The selection also sets irrigation days per week.
METHOD / TRACEABILITY

Visible formulas and assumptions

Volume/jour irrigué = besoin journalier × 7 ÷ jours/semaine
  • Deterministic schedule with no weather forecast.
  • Sectors are sequenced from the selected start time.
PROJECT PROGRESSION→ SOLAR
AUTIXON / SOLAR PUMPING

Design the pump’s solar power system

Complete flow, TDH, motor power and pumping hours before transfer.

PUMP SIZING REQUIRED
Engineering reference

Irrigation Schedule Calculator

Convert crop water demand and sector runtime into a transparent weekly irrigation schedule.

Calculation method

Weekly demand is distributed over the selected irrigation days. Sector events are sequenced from the chosen start time using the calculated duration.

Formulas used

  • Volume per irrigation day = daily demand × 7 / irrigation days
  • Event duration = sector volume / sector flow

Worked example

A 35 m³/day average demand irrigated three days per week requires about 81.7 m³ on each irrigation day.

How to interpret the result

Confirm that events fit source availability and revise frequency when soil storage or crop stress does not support the interval.

Common mistakes

  • Treating a weekly average as a weather forecast.
  • Scheduling beyond available pumping hours.
  • Ignoring soil storage and allowable depletion.

Scope and limitations

  • The schedule is deterministic and does not ingest live weather, soil moisture or controller data.

Frequently asked questions

Is this a weather-based controller?

No. It schedules the data entered by the user and exposes every assumption.

Can irrigation run every day?

Yes, if selected and compatible with agronomic and operational constraints.

Why can the schedule exceed the available window?

Required volume, sector flow or sector count is incompatible with the entered time window.